Project
PLTS Sambelia is a 7.25 MWp solar photovoltaic plant located in Lombok Timur, Lombok, Nusa Tenggara Barat, and the first horizontal single-axis tracking facility installed in Indonesia.
Synergy Renewable Energy has been involved in all phases of this project, providing development assistance from project inception, executing the engineering, procurement and construction (EPC) scope and supplying ongoing operations and maintenance (O&M) services.
News clippings
- Renewable energy plays vital role in reducing inequalities in Asia-Pacific – Jakarta Post – 2 April 2020
- N. Sumatra, W. Nusa Tenggara add small renewable-energy plants – Jakarta Post – 20 January 2020
- PLTS Sambelia di Lombok Beroperasi – Kompas – 20 January 2020
- Terus dorong perkembangan green energy, PLN UIW NTB operasikan PLTS Sambelia – Antara NTB – 16 January 2020